Titel:
|
Lightning damage of OWECS part 1 : 'parameters relevant for cost modelling'
|
|
Auteur(s):
|
Rademakers, L.W.M.M.; Braam, H.; Ramakers, S.G.M.; Wessels, H.R.A.; Prins, R.K.N.J.; Lok, R.; Leunis, L.
|
|
Gepubliceerd door:
|
Publicatie datum:
|
ECN
Windenergie
|
1-6-2002
|
|
ECN publicatienummer:
|
Publicatie type:
|
ECN-C--02-053
|
ECN rapport
|
|
Aantal pagina's:
|
Volledige tekst:
|
56
|
Download PDF
(648kB)
|
Samenvatting:
In order to obtain a better understanding of the costs resulting fromlightning damages, ECN has defined the project "Cost Modelling of Lightning
Damage for Offshore Wind Farms. The project in fact has three main objectives,
which correspond to the main tasks in the project.
- Collection of Data.
An inventory has been made of all relevant aspects that contribute to
the costs of lightning damage. The aspects have been parameterised to
apply them as input in the cost model. If necessary, not only the most
likely values have been determined but also the uncertainties by specifying
either the minimum and
maximum values or by specifying the statistical distribution functions
of these variables.
- Probabilistic Cost Model.
The scatter and uncertainties of most variables wil1 lead to scatter
in the annual costs for lightning damage and the annual downtime. To
evaluate the effect of lightning damage on the annual costs and downtime,
a probabilistic model has been developed. The model has been implemented
in MS Excel with the add-in module @Risk to perform probabilistic calculations.
- Case Studies.
With the probabilistic tost model and tbe parameters estimated, a number
of wind farm configurations on various offshore locations at the North
Sea have been analysed. Based on the results of these analyses recommendations
and generic conclusions have been drawn.
This report contains data and parameters necessary to estimate
- the annual costs;
- the annual downtime; and
- their uncertainty.