Titel:
|
O&M Cost Reduction of Offshore Wind Farms - A Novel Case Study
|
|
Auteur(s):
|
|
|
Gepubliceerd door:
|
Publicatie datum:
|
ECN
Windenergie
|
31-7-2014
|
|
ECN publicatienummer:
|
Publicatie type:
|
ECN-E--14-028
|
ECN rapport
|
|
Aantal pagina's:
|
Volledige tekst:
|
44
|
Download PDF
(2072kB)
|
Samenvatting:
This report gives a summary of the FLOW “Operation and Maintenance Cost Estimator (OMCE)” project. In this report first a short introduction to operation and maintenance (O&M) of offshore wind farms is given and then, the tools which are further developed through this project for O&M cost estimation are discussed. Furthermore, an O&M study for RWE’s Rhyl Flats offshore wind farm is demonstrated and the results are discussed.
Terug naar overzicht.