|
Titel:
|
|
RECOFF; Task 3: Optimisation of the O&M costs to lower the energy costs
|
|
|
|
Auteur(s):
|
|
|
|
|
|
Gepubliceerd door:
|
Publicatie datum:
|
|
ECN
Windenergie
|
1-11-2004
|
|
|
|
ECN publicatienummer:
|
Publicatie type:
|
|
ECN-C--04-109
|
ECN rapport
|
|
|
|
Aantal pagina's:
|
Volledige tekst:
|
|
19
|
Download PDF
(2160kB)
|
Samenvatting:
A Probabilistic O&M Cost Optimisation model is presented,
with which the operation and maintenance strategy of offshore windfarms
can be improved. Basis for the application of this model is an extensive
analysis of the fault detection and repair cycle offshore. A calculation
model has been added.
Terug naar overzicht.