Titel:
|
Considerations for selecting an additional province for developing a NAMA proposal
|
|
Auteur(s):
|
|
|
Gepubliceerd door:
|
Publicatie datum:
|
ECN
Beleidsstudies
|
26-3-2013
|
|
ECN publicatienummer:
|
Publicatie type:
|
ECN-E--13-013
|
ECN rapport
|
|
Aantal pagina's:
|
Volledige tekst:
|
12
|
Download PDF
(616kB)
|
Samenvatting:
This note provides background information to facilitate the province selection process by the Ministry of Energy and Mineral Resources (ESDM) and the Ministry of Planning (BAPPENAS). It offers criteria that may feed a discussion on how to maximize the benefits to Indonesia of extending the project scope. The first step narrows down the number of considered provinces based on a set of practical minimum conditions, the second step uses several possible selection criteria based on benefits for Indonesia.
Terug naar overzicht.